December was a rough month, with much less progress than we had hoped for. We were still productive when we could be, but we did have a few setbacks, and learned about a few things we should (and shouldn’t) do for our building. Because of that, this post has fewer pictures and a lot more text than most of the recent updates.
December 2013 – Patio Beams, Ceiling Foam, Interior Walls, Tradegy and Setbacks
Leave a reply